2026
Project: 70-tonnes capacity knuckle boom crane with an active heave compensated (AHC) winch
Our scope: Installation of electrical and hydraulic systems
Execution of electrical scope: installation of cable trays, cable laying, terminations, and connections.
Hydraulic work including: pipes fittings, hydraulic hoses assembly, connections of hydraulic valves, flushing and pressure testing.
Responsibilities also included coordination of works, troubleshooting, material specification and procurement.

